Слесарь по контрольно-измерительным приборам и автоматике
Кайрат
Город
Благовещенск (Амурская обл.)
Описание
Personal details: CV
Name of surname: Kairat Balgazin Sakenovich.
Date of birth: 14/06/1980
Contact phones: +7 (705) 478-58-71, +7 7132 510540. +77752990318
Email address: balgazin_k@mail.ru — preferable way of contact
Address: RK, Aktobe, Br.Zhubanov str. 298- 148
Citizenship: Kazakhstan
Education: January 1995 — January 1998 The Aktobe Oil and Gas College. Specialty: Electrician of Industrial Equipment.
• 2009-2012The Aktobe Oil and Gas College Specialty: Technical Operation, Maintenance and Repair of Electrical and
Electromechanical Equipment Electrician.
Passed Courses for the KPJV TCO project 05.08.2017.
CERTIFICATE: Has completed the PTW JHA course Date Маrt-2019 Expire date 5- Dec-2018
Has successfully completed 8-hours Safe Driving course Date 08/09/2014 Expire date 08/09 2017
Has successfully completed the isolation of Hazardous Energy course.date20/06/12 Expire date 20/06/2015
Has successfully completed the TCO Safe Excavation Practices Overview Course.date19/04/2017 Expire date 20/04/2017
Has successfully completed the Electrical Safe Work Practices course Expire date 19/06/2017
Language skills:
Language knowledge: Russian – fluent. Kazakh-fluent, English - intermediate. Ability to use language structures in familiar situations. Mistakes, uncertainties could happen but in general, appropriate understanding of language messages is achieved. Ability to start and keep u a conversation with work subject.
Other skills: Awareness of Company’s policies (TCO, Agip), organizational skills, team player, computer literacy (Internet, Microsoft
Position: Instrument and Electrical Supervisor
Work experience — 18 years. Driving license: “B, C” categories
Mart 2019 - Mart 2020
Consolidated Contractors International Company.
Supervision E&I.
Loop Checking and Field Instrument Testing Procedure. Troubleshooting and calibration of instruments: Pressure,Temperature, Level, Flow transmitters.Field Instrument calibration. ESD, DCS sistems checking. Valves setting including Siemens, Masoneilan Dresser, SMC, Samson, Fisher and other. Setting instruments VEGA GmbH , Endress hauser, Yokogawa, WIKA GmbH, Foxboro, Emerson and other . Mounting equipment check. Experience with Hart Communicator-475, multi meter.
Read and use drawings and schematics, including Electrical (schematic & single line diagrams, Instrumentation, loop & spec sheets, Pneumatic and P&ID). Loop Checking and Field Instrument Testing. Field Instrument calibration. ESD, DCS sistems checking. Valves setting. - Ensuring the implementation of safety provisions in the workplace;
- Assuring the compliance of electrical works performed with Issued for Construction )Design, Technical Specifications;
- Monitoring and tracking the progress of electrical work activities, promptly detecting eventual criticalities or delays and proceeding in problem solving by coordinating with Site Manager, in order to reach schedule objectives defined;
- Implementing Quality Control Plan on site;
- Detecting possible non conformities during the works activities
• July 2018 — December 2018
• 6 months'
• BI-Group,TM KAZPACO
• Атырау, www.bi-group.kz
• Supervisor E&I
• Professional skill:Atyrau Tengiz, Prorva
- Advanced PC user;
- Skills of electrical work of any complexity;
- Skills in the organization of operation of the energy sector of industrial enterprises and municipal facilities;
- Skills of organization of work of power personnel of the enterprise;
— Knowledge of regulatory documents PUES, PTEN, BEES, DNAOP, DBN, SNIP;
- Skills in the development of energy consumption standards;
- Skills in tendering;
- Experience with both power grids and various equipment;
- Skills of commissioning of completed construction energy facilities;
• Driving license: “B, C” categories
• Company and location RENAISSANCE CONSTRUTION (YMAL LNG RUSSIA) I work in Russia
• Period: маy 2017 – June 2018
• Position Quality Control Engineer Instrument and Electrical
• Duties:
• - Technical training on adjustment, maintenance and testing of instrumentation and automation equipment, measurement;
• - compilation and Preparation of delivery of documentation to the customer, Yamal LNG input control of Folders commissioning in addition I do work on Insulation, Painting, Pipes, maintenance of reporting technical documentation; executive documentation.
• - compilation of methods for measuring physical quantities and technological parameters;
• I have work experience:
• - with the Honeywell console;
• - with a communicator supporting the Hart protocol, Honeywell
• - with devices Fisher, Rosemount, Yokogawa, Drager, Magnetrol, Vega
• - with hydraulic valves Poladon, electric valves Rotork, construction.
• Period: July 2016 — Mach 2017 (At the end of the project, the reduction.)
• Position Supervisor E&I
• Company and location SITEK Caspian LLP, ATYRAU
• Supervisor Instrument and Electrical
• Turnarounds A turnaround is the financial recovery of a compan constructiony that has been performing poorly for an extended time. To effect a turnaround, a company must acknowledge and identify its problems, consider changes in management, and develop and implement a problem-solving strategy. In some cases, the best strategy may be to cut losses by liquidating the company rather than trying to turn it around.
• Супервайзер КИПиА/Instrument supervisor Karabotan
✓ Workflow Management on site
✓ Organization and implementation of the schedule of the client
✓ Monitoring of the availability of appropriate tools, personal protection equipment
✓ Conduct daily meetings, reports
✓ Control over safety of work
✓ Quality control of executed works
✓ Verification of the working documentation
✓ Flow Control work packages and accuracy of filling checklists
✓ Management of risks and dangers
✓ Issuing and managing the permit
✓ Organization of training, installation and commissioning works.
✓ to work on setting up the equipment.
✓ Development of normative materials on maintenance and repair of office equipment (repair and maintenance standards for cost, schedule, service parts, and of interchangeable wear parts, norms and limits the flow of necessary materials.
✓ Analysis of the cause of the malfunction in accordance with the technical standards.
✓ Preparation of applications for spare parts, materials, tools, control of the correctness of their spending.
✓ Development of proposals for improving the organization of the repair and maintenance of office equipment.
✓ Keeping records of installation works, preparation of necessary technical documentation and maintenance of established reporting.
✓ Assist with testing and commissioning of the equipment.
✓ Good knowledge of the various types of test equipment and means of communication (HART-communicator)
✓ Check circuit, hot and cold on all types of instrumentation systems.
✓ Calibration of all types of control panels instrumentation.
✓ Testing the logic / sequence-based systems, and microprocessor-based relay.
✓ Complete pre-test commissioning sheets Commissioning test sheets (ITR), the opportunity to draw up lists of punch and margins "as built" drawings and information on the manufacturer..
When I worked in the company on Cytec LTD, 350 people worked for me in different jobs. They were engaged in different works of cable pulling, cable clipping, disconnection in the pallets of LDB, TDB. Leray in the ponelj and jibi box by the terminal screens installation of ferrules, tips, and tagged wires jumper 0.75 between the terminal and the barriers, the motors of the glendovka and according to the star or triangle scheme. Lighting in a single line. Avar lighting, heat satellites, Supports are colored. Grounding metal connection must lubricate with chumadex lubricate all bolts that would not be oxidation work on the estimated documentation glend must be all according to the standard of the right to make the ring should be in the armor and seal all the work should be done according to the TCO standard.
I read schemes, folders, pinadi, lockshen, loupe drowing, date shield, odnananeynye.
For 18 years I did the analysis of the degree of work. The work performed safely followed the safety technique, if I saw when a person is not working safely I stopped work and explained how to do a job safely
I always did it safely.
Period: January 2010 — April 2016 (At the end of the project, the reduction.)
• Position Supervisor E&I
• Company and location Kentech LLP, Tengiz
Responsibilities:
➢ Organization of the work on the technical maintenance and repair of control and measuring instruments;
➢ Commissioning of automated systems and its maintenance;
➢ Maintenance of various instrumentation producers (Metran, Teplopribor, Kontaktpribor, Yokogawa, Endress &Hauser, Siemens, Elster, Rosemount, PROMAG and etc.);
➢ Repair, checking, the calibration of the instruments;
➢ Work with the operational controllers of Siemens S7300/S7400;
➢ Organization of safe and fault-free functioning of automated systems;
➢ Maintenance of security and fire alarm systems. Work with various security and fire alarm system producers (Bolid, Rosa, Picket and etc.);
➢ Installation and commissioning services on security and fire alarm systems. Work with the “Orion” system;
➢ Scheduling of Method Statement and instrumentation maintenance;
➢ Compliance with the labor protection rules and regulations upon working with instrument and security and fire alarm systems.
Worked at Kashagan Island-D, Kashagan-A.
Agip passport is available. Position: Instrumentation Technician and Equipment Calibration
• Period: November 2008 — January 2010 (3 months) (At the end of the project, the reduction.)
• Position: Electrical Technician
• Company and location Russian Copper Company, Khromtau
Responsibilities:
➢ Control of documents submitted by Contractors and assurance of serial completion.
➢ Preparation of acts in case of non-compliance to project requirements.
➢ Calibration and installation of instrumentation equipment, hook-ups, cable laying, circuit test, final test.
➢ Inspection of incoming equipment.
➢ Telecommunication system installation
➢ Installation and connection of cables in instrumentation panels.
➢ Inspection and detection of arrears of works.
➢ Control of work performance in accordance with Company’s safety policies. Cooperation with Company’s Quality Control department. Work with project documentation.
• Period: April 2007 — April 2008 (At the end of the project, the reduction.)
• Position: Electrical Technician
• Company and location: Danoil, Astana
Responsibilities:
➢ Instrumentation commissioning. Work with equipment Hart Communicator -475.375, Hydrotron-700. 1000 multimetr Megger -500;
➢ Continuity check and commissioning of thermoelectric cell. PIT-pressure transformer, ТIT- temperature transformer, PSV-pressure safety valve, UY-electromagnetic valve, LI-level indicator, XFM-fire call point, XGA-gas audiovisual alerter. Continuity check, Pre-Commission, Turnover, Commissioning. Work with the following equipment: Hart Communicator - 475 375 Hydrotron, Flux, Megger.
➢ Assembling and installation of fiber optic lines and panels. Inspection and detection of arrears of works. Preparation of acts in case of non-compliance to project requirements.
➢ Calibration and installation of instrumentation equipment.
• Period: April 2006 –April 2007 (At the end of the project, the reduction)
• Position: Instrumentation Technician
• Company and location Kentech LLP, Atyrau
Responsibilities:
➢ Installation of instrumentation equipment as per norms.
➢ Installation of overhead and impulse lines. Leak test.
➢ Control of documents submitted by Contractors and assurance of serial completion. Installation of hook-ups, cable laying, circuit test, final test.
➢ Inspection of incoming equipment.
➢ Telecommunication system installation
➢ Assembling and installation of fiber optic lines and panels. Inspection and detection of arrears of works.
➢ Control of work performance in accordance with TCO Company’s safety policies. Cooperation with TCO Quality Control department.
• Period: July 2002 —April 2006 (3 years and 10 months)( At the end of the project, the reduction)
• Position: Duty Electrician
• Company and location: M-I Drilling, Atyrau
2 августа, 2016
Анна
Город
Благовещенск (Амурская обл.)
Возраст
36 лет ( 1 января 1989)
2 августа, 2016
Александр
Город
Благовещенск (Амурская обл.)
Возраст
48 лет (28 июня 1976)
8 августа, 2016
Роман
Город
Благовещенск (Амурская обл.)
Возраст
47 лет (16 января 1978)